Concrete Contractor Estimate Template

A concrete contractor estimate forecasts the price before work starts: 9 lines for replace a 20x40 ft driveway with a four-inch reinforced slab and broom finish, totalling $9,563.00, with labour the largest share (58%). It states its assumptions and stays valid for 30 days. Edit the lines and download the PDF.

Pre-filled for a concrete contractor: replace a 20x40 ft driveway with a four-inch reinforced slab and broom finish. Example prices: replace them with your own.

Document
From (you)
Prepared for
Line items
  1. Amount$1,800.00
  2. Amount$880.00
  3. Amount$456.00
  4. Amount$1,120.00
  5. Amount$1,925.00
  6. Amount$2,480.00
  7. Amount$360.00
  8. Amount$392.00
  9. Amount$150.00
Discount, tax and payments

Estimate total: $9,563.00

Notes, payment details and extra fields
Design, logo, currency and paper
Logo (PNG or JPEG, up to 1 MB; stays on your device)

Pro tools

Saved clients, item library, auto-numbering, history and bulk PDFs is part of Pro.

From

Westbrook Concrete

194 Market Street
Franklin, TN 37064

billing@example.com

(312) 555-0194

Estimate

Estimate #
EST-8537
Estimate date
Oct 29, 2026
Valid until
Nov 28, 2026
Terms
Valid 30 days
Job site address
311 Pine Road
Contractor license no.
LIC-588417
Ready-mix ticket no.
See notes
Concrete strength (psi)
See notes

Prepared for

Morgan Ellis

311 Pine Road
Georgetown, TX 78626

client@example.com

DescriptionQtyRateAmount
Break out and remove existing driveway800 sq ft$2.25$1,800.00
Grade and compact 4 in gravel base800 sq ft$1.10$880.00
Crushed gravel base12 ton$38.00$456.00
Forms and wire mesh reinforcement800 sq ft$1.40$1,120.00
Ready-mix concrete, 4000 psi11 cu yd$175.00$1,925.00
Place, finish and broom texture800 sq ft$3.10$2,480.00
Saw-cut control joints and apply cure-and-seal800 sq ft$0.45$360.00
Concrete disposal fee14 ton$28.00$392.00
Driveway apron permit1 each$150.00$150.00
Subtotal
$9,563.00
Estimate total
$9,563.00

Notes

A concrete estimate should state the area, thickness, reinforcement, concrete strength, finish, removal of the old slab and truck access requirements.

Made with Billwise - invoice-pdf-maker-app.web.app

Preview of the PDF. Everything stays in your browser: nothing is uploaded.

Preview

Concrete Contractor estimate at a glance

Scope estimated Replace a 20x40 ft driveway with a four-inch reinforced slab and broom finish
Estimate total $9,563.00 before tax
Valid for 30 days from the estimate date
Deposit A third up front is common to cover the concrete order and forming.
Labour (4 lines) $5,520.00, 58%
Materials (3 lines) $3,501.00, 37%
Fees (2 lines) $542.00, 6%
Priced in sq ft

Estimate breakdown for replace a 20x40 ft driveway with a four-inch reinforced slab and broom finish

Example prices: replace them with your own
ItemTypeEst. quantityEst. amount
Break out and remove existing drivewayLabour800 sq ft$1,800.00
Grade and compact 4 in gravel baseLabour800 sq ft$880.00
Crushed gravel baseMaterials12 ton$456.00
Forms and wire mesh reinforcementMaterials800 sq ft$1,120.00
Ready-mix concrete, 4000 psiMaterials11 cu yd$1,925.00
Place, finish and broom textureLabour800 sq ft$2,480.00
Saw-cut control joints and apply cure-and-sealLabour800 sq ft$360.00
Concrete disposal feeFees14 ton$392.00
Driveway apron permitFees1 each$150.00
Estimated total$9,563.00

What to write on a concrete contractor estimate

A concrete estimate should state the area, thickness, reinforcement, concrete strength, finish, removal of the old slab and truck access requirements.

Materials and products are $3,501.00 of this $9,563.00 estimate (37%), so say how long those prices hold: supplier prices can move before the job starts.

Prices flatwork per square foot by thickness and finish, with ready-mix billed by the cubic yard and supplier short-load charges passed through.

Assumptions behind each line

Write these next to the 9 lines so the customer sees what the $9,563.00 depends on.

  • Break out and remove existing driveway: 800 sq ft at $2.25 per sq ft ($1,800.00); extra sq ft at the same rate.
  • Grade and compact 4 in gravel base: 800 sq ft at $1.10 per sq ft ($880.00); extra sq ft at the same rate.
  • Crushed gravel base: 12 ton at $38.00 ($456.00); another grade or brand changes this line.
  • Forms and wire mesh reinforcement: 800 sq ft at $1.40 ($1,120.00); another grade or brand changes this line.
  • Ready-mix concrete, 4000 psi: 11 cu yd at $175.00 ($1,925.00); another grade or brand changes this line.
  • Place, finish and broom texture: 800 sq ft at $3.10 per sq ft ($2,480.00); extra sq ft at the same rate.
  • Saw-cut control joints and apply cure-and-seal: 800 sq ft at $0.45 per sq ft ($360.00); extra sq ft at the same rate.
  • Concrete disposal fee: a flat $392.00.
  • Driveway apron permit: a flat $150.00.

Changes, overruns and change orders

If the customer adds work, put it on a signed change order first. Pricing the extra in sq ft keeps it comparable with the $9,563.00 you estimated.

A 10% rise in material prices would add $350.10 to this job, which is why many concrete contractors limit how long an estimate stays valid.

Tips from concrete work billing

  • Copy the batch ticket number, mix strength and yards delivered onto the invoice, because that is your proof of what went into the slab if cracking or strength is ever questioned.
  • Explain next to the joint line that control joints exist to direct cracking and that hairline cracks are normal, so a crack in week three does not become a payment dispute.
  • Pass through short-load and truck waiting charges from the ready-mix supplier at cost, with the supplier ticket attached, rather than swallowing them.
  • If a pour was rescheduled for rain or freezing temperatures, note the new date and bill any re-mobilization fee the contract allows.

Turning the concrete contractor estimate into an invoice

  1. Get it approved

    Ask Morgan Ellis to sign or reply in writing to estimate EST-8537.

  2. Record the changes

    Update quantities to what was actually used across the 9 lines.

  3. Switch the document type

    Change Estimate to Invoice in the tool; the lines and parties stay.

  4. Deduct what was paid

    Enter any deposit as amount paid so the balance due is correct.

Frequently asked questions

How do I write a concrete contractor estimate?

Describe the job (Replace a 20x40 ft driveway with a four-inch reinforced slab and broom finish), list each line with an estimated quantity and rate, total it ($9,563.00 in the sample), state how long it is valid and what it assumes, then send it as a PDF for approval.

Is a concrete contractor estimate binding?

An estimate is a forecast, not a fixed price, so the final invoice can differ when the work or materials change. Rules vary by country and state; to stay safe, get written approval before billing noticeably more than the $9,563.00 you estimated.

How long should a concrete contractor estimate be valid?

Thirty days is common and is what this template uses. With 37% of the price in materials, a shorter validity protects you if supplier prices rise.

Founder price

Billwise Pro opens soon

Lifetime Pro: no footer, saved clients/items, auto numbering, CSV/XLSX export, bulk generation. Reserve the founder price: 30% off $29 one-time when Pro opens. No payment is taken now. Everything on the free plan keeps working today.

We'll e-mail you once when Pro opens, with your founder price. No account, no newsletter. See the privacy policy.