An estimate is an approximate price for a job, worked out before the work starts from the expected labour, materials and other costs, which may change if the work turns out to be different from what was assumed. The template below is pre-filled with a sample from Oak Lane Roofing to Sam Patel: 5 lines, $10,550.00. Edit it and download the PDF.

Pre-filled estimate sample ($10,550.00). Example prices: replace them with your own.

Document
From (you)
Prepared for
Line items
  1. Amount$2,090.00
  2. Amount$6,820.00
  3. Amount$510.00
  4. Amount$480.00
  5. Amount$650.00
Discount, tax and payments

Estimate total: $10,550.00

Notes, payment details and extra fields
Design, logo, currency and paper
Logo (PNG or JPEG, up to 1 MB; stays on your device)

Pro tools

Saved clients, item library, auto-numbering, history and bulk PDFs is part of Pro.

From

Oak Lane Roofing

12 Market Street
Springfield, IL 62704

billing@example.com

Estimate

Estimate #
EST-0001
Estimate date
Oct 29, 2026
Valid until
Nov 28, 2026
Terms
Valid 30 days. The final price may differ by up to 10% if mo
Job site
8 Chestnut Lane, Franklin, TN
Roof area
22 squares (2,200 sq ft)

Prepared for

Sam Patel

40 Station Road
Fairview, OR 97024

DescriptionQtyRateAmount
Strip and dispose of existing shingles22 square$95.00$2,090.00
Architectural asphalt shingles, installed22 square$310.00$6,820.00
Replace damaged roof decking (allowance)Six sheets assumed; billed per sheet actually replaced6 sheet$85.00$510.00
Ridge vent and flashing40 linear ft$12.00$480.00
Dumpster rental and permit1 job$650.00$650.00
Subtotal
$10,550.00
Estimate total
$10,550.00

Notes

Excludes gutter replacement and interior ceiling repairs.

Made with Billwise - invoice-pdf-maker-app.web.app

Preview of the PDF. Everything stays in your browser: nothing is uploaded.

Preview

What is an estimate?

An estimate is an approximate price for a job, worked out before the work starts from the expected labour, materials and other costs, which may change if the work turns out to be different from what was assumed.

The tool prints it with the heading "Estimate" and behaves as an estimate, with a valid-until date instead of a due date.

Sample estimate: Oak Lane Roofing to Sam Patel

Example prices: replace them with your own
ItemQtyRateAmount
Strip and dispose of existing shingles22 square$95.00$2,090.00
Architectural asphalt shingles, installed22 square$310.00$6,820.00
Replace damaged roof decking (allowance) (Six sheets assumed; billed per sheet actually replaced)6 sheet$85.00$510.00
Ridge vent and flashing40 linear ft$12.00$480.00
Dumpster rental and permit1 job$650.00$650.00
Total$10,550.00

When to use an estimate

  • The final cost depends on what you find once work begins, such as hidden damage in a repair.
  • A customer is comparing contractors and wants a budget figure before committing.
  • You need the customer's go-ahead before ordering materials or starting labour.
  • The job is billed on time and materials and you want to set expectations up front.

What an estimate must include

  • The heading 'Estimate'
  • Estimate number and date
  • Customer name and job address
  • Description of the work and the assumptions behind the price
  • Labour, materials and other costs on separate lines
  • Estimated total and whether tax is included
  • How long the estimate is valid
  • What could make the final price differ, and by roughly how much
  • Exclusions: work that is not included
  • Space for the customer's approval

Estimate vs similar documents

  • vs quote

    A quote is a fixed price that holds if the customer accepts it within the validity period; an estimate is a best guess that can change as the work reveals more.

  • vs final invoice

    The estimate comes before the work and is not a bill; the final invoice charges for what was actually done.

  • vs purchase order

    An estimate is the seller's price; a purchase order is the buyer's formal order once it agrees to that price.

How to make an estimate

  1. Open the pre-filled sample

    The tool above starts as "Estimate" from Oak Lane Roofing to Sam Patel.

  2. Replace the parties

    Enter your business and your customer, plus job site and roof area.

  3. Edit the lines

    Change the 5 sample lines ($10,550.00 in total) to your own items and prices.

  4. Check the required fields

    Make sure all 10 fields listed above are filled, then download the PDF.

Trades that use an estimate

Frequently asked questions

Is an estimate legally binding?

An estimate is generally not a firm offer, but a final bill far above it without warning can give the customer grounds to dispute, and some places regulate estimates for certain trades. State the assumptions and the expected range, and get approval before exceeding it.

How long should an estimate be valid?

Long enough for the customer to decide and short enough that your material prices still hold. Print a fixed validity, such as 30 days, on the estimate.

What happens when the work costs more than the estimate?

Tell the customer as soon as you know, explain why and get approval, ideally as a written change order, before doing the extra work. The final invoice then shows the estimate plus the approved changes.

Founder price

Billwise Pro opens soon

Lifetime Pro: no footer, saved clients/items, auto numbering, CSV/XLSX export, bulk generation. Reserve the founder price: 30% off $29 one-time when Pro opens. No payment is taken now. Everything on the free plan keeps working today.

We'll e-mail you once when Pro opens, with your founder price. No account, no newsletter. See the privacy policy.