Skip to content

Framing Contractor Invoice Template

A framing contractor invoice bills sq ft, lists labour, equipment and materials on separate lines and states the terms (Weekly draws on footage completed, Net 7). This template is pre-filled for frame a two-story 2,200 sq ft house shell, labor only, with the lumber package supplied by the builder: 8 lines totalling $26,480.00 before tax. Edit it and download the PDF.

Pre-filled for a framing contractor: frame a two-story 2,200 sq ft house shell, labor only, with the lumber package supplied by the builder. Example prices: replace them with your own.

Document
From (you)
Bill to
Line items
  1. Amount$20,900.00
  2. Amount$720.00
  3. Amount$680.00
  4. Amount$1,680.00
  5. Amount$600.00
  6. Amount$700.00
  7. Amount$480.00
  8. Amount$720.00
Discount, tax and payments

Balance due: $26,480.00

Notes, payment details and extra fields
Design, logo, currency and paper
Logo (PNG or JPEG, up to 1 MB; stays on your device)

Pro tools

Saved clients, item library, auto-numbering, history and bulk PDFs is part of Pro.

From

Fox Hollow Framing

799 Market Street
Georgetown, TX 78626

billing@example.com

(503) 555-0199

Invoice

Invoice #
INV-1557
Invoice date
Oct 29, 2026
Due date
Nov 28, 2026
Terms
Weekly draws on footage completed, Net 7
Plan set and revision date
15 November 2026
Lot no.
See notes
Builder
See notes
Framing inspection date
25 November 2026

Bill to

Avery Lindqvist

140 Orchard Drive
Madison, WI 53703

client@example.com

DescriptionQtyRateAmount
Frame floor systems, walls and roof, labor onlyPer sq ft of total floor area on plans2,200 sq ft$9.50$20,900.00
Install hold-downs, straps and hurricane tiesPer structural plan schedule120 each$6.00$720.00
Set engineered beams and LVL headers8 each$85.00$680.00
Frame covered front porch140 sq ft$12.00$1,680.00
Blocking for cabinets, grab bars and TV mounts10 hr$60.00$600.00
Crane for roof truss setHalf day with operator0.5 day$1,400.00$700.00
Fasteners, nails and sill gasket1 lot$480.00$480.00
Change order 2: rework stair opening after plan revision12 hr$60.00$720.00
Subtotal
$26,480.00
Balance due
$26,480.00

Notes

Thank you for choosing Fox Hollow Framing. Terms: Weekly draws on footage completed, Net 7.

Payment details

Bank transfer or card. Please quote the invoice number.

Made with Billwise - invoice-pdf-maker-app.web.app

Preview of the PDF. Everything stays in your browser: nothing is uploaded.

Preview

Framing Contractor invoice at a glance

Typical job Frame a two-story 2,200 sq ft house shell, labor only, with the lumber package supplied by the builder
Main billing unit sq ft
Usual payment terms Weekly draws on footage completed, Net 7
Deposit practice Framers working for builders usually invoice weekly progress instead of taking a deposit; homeowner jobs may require one before the crew is scheduled.
Sample lines 8 lines, $26,480.00 before tax
Largest line Frame floor systems, walls and roof, labor only: $20,900.00 (79%)
Labour hours billed 22 h, $25,300.00
Trade-specific fields Plan set and revision date, Lot no., Builder, Framing inspection date, Change order no.

Sample framing contractor invoice line items

Frame a two-story 2,200 sq ft house shell, labor only, with the lumber package supplied by the builder: 8 lines adding up to $26,480.00, split into labour $25,300.00 (96%), equipment $700.00 (3%) and materials $480.00 (2%).

Example prices: replace them with your own
ItemQtyRateAmount
Frame floor systems, walls and roof, labor only (Per sq ft of total floor area on plans)2,200 sq ft$9.50$20,900.00
Install hold-downs, straps and hurricane ties (Per structural plan schedule)120 each$6.00$720.00
Set engineered beams and LVL headers8 each$85.00$680.00
Frame covered front porch140 sq ft$12.00$1,680.00
Blocking for cabinets, grab bars and TV mounts10 hr$60.00$600.00
Crane for roof truss set (Half day with operator)0.5 day$1,400.00$700.00
Fasteners, nails and sill gasket1 lot$480.00$480.00
Change order 2: rework stair opening after plan revision12 hr$60.00$720.00
Subtotal$26,480.00
Total before tax$26,480.00

What a framing contractor invoice should include

  • Your framing company name, address, phone and email, plus a tax ID if you are registered
  • The customer's name and billing address (Avery Lindqvist in the sample)
  • A unique invoice number (INV-1557) and the issue date
  • Payment terms and a due date: Weekly draws on footage completed, Net 7
  • Plan set and revision date: for example 15 November 2026
  • Lot no.: for example See notes
  • Builder: for example See notes
  • Framing inspection date: for example 25 November 2026
  • Line items in sq ft or per item, each with quantity, rate and amount
  • How to pay you: bank details, card link or cheque payee

How framing contractors bill

Framing subcontractors usually price labor per square foot of floor area framed, with the lumber package supplied by the builder and extras billed per item or by the hour.

Framing contractors commonly use "Weekly draws on footage completed, Net 7", so payment is due 7 days after the invoice date. Framers working for builders usually invoice weekly progress instead of taking a deposit; homeowner jobs may require one before the crew is scheduled.

U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2024: median hourly wage of Carpenters $28.51 (employees, not contractor rates). The sample's $60.00 per hour for "Blocking for cabinets, grab bars and TV mounts" is 2.1 times that employee figure; a business rate also has to cover insurance, tools, travel, unbilled admin time and profit.

Framing Contractor invoicing tips

  • Say clearly whether the price is labor only or includes the lumber package, because a framing invoice read the wrong way can look three times higher than the builder expected.
  • Measure footage from the stamped plan set and print its revision date on the invoice; when the plans change mid-job, the revision date shows which version the original price covered.
  • List structural hardware installs by count against the engineer's schedule, since inspectors reject framing for missing straps or hold-downs and the builder wants proof they were installed.
  • Bill corrections the framing inspector requires on your own work at no charge, but invoice corrections caused by plan changes or other trades as change orders with the inspector's note attached.

Framing Contractor billing disputes to head off

  • Waiting time when the lumber delivery is late or incomplete is easy to lose. Logging the delayed hours with the delivery date on the invoice gives you a basis to bill standby time.
  • Builders sometimes hold the last draw until the punch list is done; listing the punch items completed and the date the frame passed inspection moves that final payment.

Work a framing contractor can bill for

Core tasks of Carpenters (O*NET 47-2031.00, O*NET 29.x task statements, CC BY 4.0). Each can become a line on the invoice.

  • Follow established safety rules and regulations and maintain a safe and clean environment.
  • Study specifications in blueprints, sketches, or building plans to prepare project layout and determine dimensions and materials required.
  • Measure and mark cutting lines on materials, using a ruler, pencil, chalk, and marking gauge.
  • Shape or cut materials to specified measurements, using hand tools, machines, or power saws.
  • Install structures or fixtures, such as windows, frames, floorings, trim, or hardware, using carpenters' hand or power tools.
  • Verify trueness of structure, using plumb bob and level.

How to make a framing contractor invoice

  1. Add both parties

    Enter Fox Hollow Framing (your business) and the customer, Avery Lindqvist, then plan set and revision date.

  2. Number and terms

    Give it a unique number such as INV-1557 and set the terms to Weekly draws on footage completed, Net 7.

  3. List the work

    One line per item: the sample runs from "Frame floor systems, walls and roof, labor only" (2,200 sq ft) to "Change order 2: rework stair opening after plan revision" (12 hr).

  4. Check the total

    The 8 lines come to $26,480.00; add sales tax only if your state taxes framing work.

  5. Download and send

    Download the PDF or print it, then keep a copy with the framing work records.

Frequently asked questions

How do I make a framing contractor invoice?

Add your framing company details, the customer, plan set and revision date, lot no., builder and framing inspection date, then one line per item with quantity and rate. The template above is pre-filled with 8 lines for frame a two-story 2,200 sq ft house shell, labor only, with the lumber package supplied by the builder totalling $26,480.00; change the prices and download the PDF.

How do framing contractors charge?

Mostly sq ft. Framing subcontractors usually price labor per square foot of floor area framed, with the lumber package supplied by the builder and extras billed per item or by the hour.

When should a framing contractor invoice be paid?

Weekly draws on footage completed, Net 7 is the usual arrangement. Framers working for builders usually invoice weekly progress instead of taking a deposit; homeowner jobs may require one before the crew is scheduled. Put the terms and the due date on the invoice so there is no doubt.

How much do framing contractors earn per hour?

U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2024: median hourly wage of Carpenters $28.51 (employees, not contractor rates). Self-employed rates are usually higher because they cover overhead and unbilled time.

Founder price

Billwise Pro opens soon

Lifetime Pro: no footer, saved clients/items, auto numbering, CSV/XLSX export, bulk generation. Reserve the founder price: 30% off $29 one-time when Pro opens. No payment is taken now. Everything on the free plan keeps working today.

We'll e-mail you once when Pro opens, with your founder price. No account, no newsletter. See the privacy policy.