General Contractor Estimate Template

A general contractor estimate forecasts the price before work starts: 9 lines for build a 12x16 ft single-story rear addition with one window and an exterior door, totalling $37,338.00, with services the largest share (51%). It states its assumptions and stays valid for 30 days. Edit the lines and download the PDF.

Pre-filled for a general contractor: build a 12x16 ft single-story rear addition with one window and an exterior door. Example prices: replace them with your own.

Document
From (you)
Prepared for
Line items
  1. Amount$1,450.00
  2. Amount$8,600.00
  3. Amount$6,528.00
  4. Amount$6,950.00
  5. Amount$3,400.00
  6. Amount$2,900.00
  7. Amount$2,300.00
  8. Amount$4,160.00
  9. Amount$1,050.00
Discount, tax and payments

Estimate total: $37,338.00

Notes, payment details and extra fields
Design, logo, currency and paper
Logo (PNG or JPEG, up to 1 MB; stays on your device)

Pro tools

Saved clients, item library, auto-numbering, history and bulk PDFs is part of Pro.

From

Riverside General Contracting

513 Market Street
Salem, MA 01970

billing@example.com

(503) 555-0113

Estimate

Estimate #
EST-2918
Estimate date
Oct 29, 2026
Valid until
Nov 28, 2026
Terms
Valid 30 days
Contractor license no.
LIC-535218
Job site address
52 Aspen Way
Permit no.
BP-405749
Contract no.
See notes

Prepared for

Sam Patel

52 Aspen Way
Franklin, TN 37064

client@example.com

DescriptionQtyRateAmount
Building permit and plan review fee1 each$1,450.00$1,450.00
Foundation: footings and 12x16 ft slabExcavation, forms, rebar, 4-in slab on vapor barrier1 project$8,600.00$8,600.00
Framing labor, walls and roof2x6 walls, engineered rafters, wall and roof sheathing96 hr$68.00$6,528.00
Framing lumber and sheathing package1 lot$6,950.00$6,950.00
Roofing subcontract, shingles tied into existing roof1 project$3,400.00$3,400.00
Electrical subcontract: one circuit, 6 outlets, 2 fixtures1 project$2,900.00$2,900.00
Window and exterior door, supplied and installed2 each$1,150.00$2,300.00
Insulation, drywall and two coats of paint640 sq ft$6.50$4,160.00
Dumpster rental, 20-yard, two hauls2 each$525.00$1,050.00
Subtotal
$37,338.00
Estimate total
$37,338.00

Notes

A general contractor's estimate should break the job into divisions (site work, foundation, framing, roofing, finishes), list allowances for owner-selected finishes and state exclusions such as landscaping repair.

Made with Billwise - invoice-pdf-maker-app.web.app

Preview of the PDF. Everything stays in your browser: nothing is uploaded.

Preview

General Contractor estimate at a glance

Scope estimated Build a 12x16 ft single-story rear addition with one window and an exterior door
Estimate total $37,338.00 before tax
Valid for 30 days from the estimate date
Deposit on acceptance (30%) $11,201.40
Services (4 lines) $19,060.00, 51%
Materials (2 lines) $9,250.00, 25%
Labour (1 line) $6,528.00, 17%
Priced in project

Estimate breakdown for build a 12x16 ft single-story rear addition with one window and an exterior door

Example prices: replace them with your own
ItemTypeEst. quantityEst. amount
Building permit and plan review feeFees1 each$1,450.00
Foundation: footings and 12x16 ft slabServices1 project$8,600.00
Framing labor, walls and roofLabour96 hr$6,528.00
Framing lumber and sheathing packageMaterials1 lot$6,950.00
Roofing subcontract, shingles tied into existing roofServices1 project$3,400.00
Electrical subcontract: one circuit, 6 outlets, 2 fixturesServices1 project$2,900.00
Window and exterior door, supplied and installedMaterials2 each$2,300.00
Insulation, drywall and two coats of paintServices640 sq ft$4,160.00
Dumpster rental, 20-yard, two haulsEquipment2 each$1,050.00
Estimated total$37,338.00

What to write on a general contractor estimate

A general contractor's estimate should break the job into divisions (site work, foundation, framing, roofing, finishes), list allowances for owner-selected finishes and state exclusions such as landscaping repair.

Materials and products are $9,250.00 of this $37,338.00 estimate (25%), so say how long those prices hold: supplier prices can move before the job starts.

Bills a fixed contract price or a cost-plus fee in progress draws tied to milestones, with approved change orders priced separately.

Assumptions behind each line

Write these next to the 9 lines so the customer sees what the $37,338.00 depends on.

  • Building permit and plan review fee: a flat $1,450.00.
  • Foundation: footings and 12x16 ft slab: 1 project, $8,600.00.
  • Framing labor, walls and roof: 96 hr at $68.00 per hr ($6,528.00); extra hr at the same rate.
  • Framing lumber and sheathing package: 1 lot at $6,950.00 ($6,950.00); another grade or brand changes this line.
  • Roofing subcontract, shingles tied into existing roof: 1 project, $3,400.00.
  • Electrical subcontract: one circuit, 6 outlets, 2 fixtures: 1 project, $2,900.00.
  • Window and exterior door, supplied and installed: 2 each at $1,150.00 ($2,300.00); another grade or brand changes this line.
  • Insulation, drywall and two coats of paint: 640 sq ft, $4,160.00.
  • Dumpster rental, 20-yard, two hauls: 2 each of hire ($1,050.00); longer hire is extra.

Changes, overruns and change orders

If the customer adds work, put it on a signed change order first. Here one more hr of "Framing labor, walls and roof" adds $68.00, or 0.2% of the estimate.

A 10% rise in material prices would add $925.00 to this job, which is why many general contractors limit how long an estimate stays valid.

Tips from general contracting work billing

  • Bill each draw against the schedule of values in the contract, showing percent complete for every line, the amount previously billed and the balance to finish, so the owner can check it against what is visibly built.
  • Give approved change orders their own lines with the change order number and signature date; blending extra work into base-contract lines is the quickest way to get an entire draw held up.
  • If the contract withholds retainage, show the gross amount earned, the retainage held back and the net amount payable on every progress invoice, then bill the released retainage separately at substantial completion.
  • Reference the lien waivers collected from subcontractors and suppliers for the previous draw, because lenders and careful owners often refuse to release funds until those waivers are in hand.

Checking the labour rate

U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2024: median hourly wage of Construction Managers $51.43 (employees, not contractor rates).

The sample's $68.00 per hour for "Framing labor, walls and roof" is 1.3 times that employee figure; a business rate also has to cover insurance, tools, travel, unbilled admin time and profit.

Turning the general contractor estimate into an invoice

  1. Get it approved

    Ask Sam Patel to sign or reply in writing to estimate EST-2918.

  2. Record the changes

    Update quantities to what was actually used across the 9 lines.

  3. Switch the document type

    Change Estimate to Invoice in the tool; the lines and parties stay.

  4. Deduct what was paid

    Enter the $11,201.40 deposit as amount paid so the balance shows $26,136.60.

Frequently asked questions

How do I write a general contractor estimate?

Describe the job (Build a 12x16 ft single-story rear addition with one window and an exterior door), list each line with an estimated quantity and rate, total it ($37,338.00 in the sample), state how long it is valid and what it assumes, then send it as a PDF for approval.

Is a general contractor estimate binding?

An estimate is a forecast, not a fixed price, so the final invoice can differ when the work or materials change. Rules vary by country and state; to stay safe, get written approval before billing noticeably more than the $37,338.00 you estimated.

How long should a general contractor estimate be valid?

Thirty days is common and is what this template uses. With 25% of the price in materials, a shorter validity protects you if supplier prices rise.

Founder price

Billwise Pro opens soon

Lifetime Pro: no footer, saved clients/items, auto numbering, CSV/XLSX export, bulk generation. Reserve the founder price: 30% off $29 one-time when Pro opens. No payment is taken now. Everything on the free plan keeps working today.

We'll e-mail you once when Pro opens, with your founder price. No account, no newsletter. See the privacy policy.